Client
PPC S.A.
Period
2012
Contractor
INTRAKAT
Use
Power Plants
Location
Greece
Downolad PDF

AGHIOS DIMITRIOSSES UNIT V SUPPLY AND INSTALLATION

  • Structural preliminary design in pre-tender stage.
  • Steel buildings, and pipe racks of 3000t total weight.
  • Foundations on concrete piles.
  • Drilling of cooling tower
  • Projects is not yet awarded.