Client
Ministry for Environment Physical Planning and Public Works
Period
1994 to 1996
Contractor
“ATEMKE” S.A.
Type
Roadbridges
Material
Concrete
Location
Greece
Downolad PDF

ATHENS – LAMIA MOTORWAY AHARNON INTERCHANGE

The complete interchange facility comprised the Motorway overpass bridge (ramp 4), the underpass bridge (ramp 2), piled walls, retain wall, the necessary drainage works e.t.c.The overpass bridge of ramp 4 is continuous over 5 spans 25,2+3x36,0+25,2m and has a total length of 230 m. The deck structure is formed by a curverd, prestressed concrete double cell box girder 7m wide. The underpass bridge of ramp 2 is a continuous reinforced concrete frame 10,5 m clear span and 105m total length, on bored piles Φ100. The construction cost (of structures only) totaled 2,4 bil drachmas in 1994.