Client
Sate of Kuwait
Period
2013
Contractor
ARCHIRODON

DOHA LINK

The scope of work was the preliminary tender design of DOHA LINK Project and was
assigned at KALLIERGOS OTM by the contractor ARCHIRODON. For the accurate estimation
of quantities, both calculations and drawings were performed at an advanced
level for all structures as follows :
• Dual overseas bridge of 7 Km total length. The bridge comprises 123 spans on piers
with steel piles foundations. The bridge deck is provided with precast-prestressed
segments.
• Three interchanges comprising bridges and retaining structures.
• One composite bridge spannng 74m over existing pipelines.