The new Doha Metro Red Line South is currently under construction. The project comprises 7 km of elevated and at-grade double railway as also three rail stations. Bridges main construction method is segmental construction with precast - prestressed segments. KALLIERGOS OTM S.A. has undertaken the Design Verification of all design diciplines.