Client
HELLENIC PUBLIC REAL ESTATE CORPORATION
Period
2001 to 2002
Contractor
G.H. BOUSBOURAS & co
Use
Commercial/Offices
Material
Concrete
Location
Greece
Rehabilitation/Strengthen
Concrete
Downolad PDF

RETROFIT OF OFFICE BUILDING

DESCRIPTION

It’ s a 9 storey office building (5 full area and 4 set back storeys with a basement).

The building in its former use housed the magistrate court and the state mortgage office.

Period of construction : 1966-1968

Covered area : 470 m2

Total service area :  4.500 m2

Structural system : Reinforced Concrete frame

RETROFIT MEASURES

  • New stiffening members (Reinforced shotcrete walls)
  • Strenghening of slabs and beams of 2nd and 3rd floor (Reinforced shotcrete).Jacketing of small section columns in upper floors.
  • Repair of damaged members.
  • New 8 storeys external emergency staircase (steel structure).
  • Reinforced shotcrete  was used to strengthen reinforced concrete members.
  • Cost of retrofit works : 430.000.00 €