Client
ABU DHABI GAS DEVELOPMENT COMPANY LIMITED
Period
2012
Use
Power Plants
Material
Steel
Location
Abroad
Downolad PDF

SULPHUR STORAGE BUILDING IN ABU DHABI

  • Structural preliminary design in pre-tender stage.
  • Steel 90m span and 50m height arch shaped wharehouse building. Total building length 300m.
  • Total steel structures weight 250t.
  • Main frames of triangular arch trusses of 2,70m height.